CORMINT AIR
Industry-leading performance with turnkey site design and construction.
From blueprint to operational in 6 months or less.
Minimize Capital Expenditure
Integrated system reduces engineering needs and onsite labor.
Fully customized infrastructure available, starting at $150k/MW.
Accelerate Deployment Speed
Our turnkey, plug and play solution enables rapid energization.
100 MW deployments, from purchase to energization within 6 months.
Protect your Investment
Oversized electrical and cooling systems to support tomorrow's miners.
Minimizes machine failure rates and enables overclocking.
Monetize your Power
Our unmatched power efficiency has a proven track record of < 3¢/kWh.
Maximize power efficiency with industry-leading automations.
Product Specifications
| Power System | Integrated Transformer |
| Container Size | 40' HC |
| Power Capacity | 2 MVA |
| Input Voltage Range | 12.47-34.5 kV |
| Miner Capacity | 383 S21 or 575 M60 |
| Cooling System Type | High Performance EC Fans (60 HP) |
| Filtration | Merv 4 or 8 Washable |
| Safety Standards | UL/NEC/OSHA |
| Max Outdoor Temp at Stock (S21) | 120°F |
| Max Outdoor Temp at 20% OC (S21) | 99°F |
| Software Compatibility | Foreman or MODBUS |
Battle Tested. Proven Results.
Cormint has consistently been recognized as one of the lowest-cost producers of Bitcoin in North America. We achieved this by engineering our own ruthlessly efficient, scalable, and battle-tested mining infrastructure from the ground up. Our 130 MW Cormint site in Fort Stockton, TX was designed and deployed by our vertically integrated product, engineering, and construction teams. This isn't a test facility; it's our proving ground and one of North America's lowest-cost production sites designed and built on the very same principles we're now offering to you.